Test

  1. Open Charging Park OCPP Status
  2. Check that Connection status is green
  3. Inform your local Charge Point Operator that the system is now set up. They should now be able to see the chain on their server.
  4. You may want to test remote connection with your Charge Point Operator before finalizing installation.